TECHNICAL GUIDE 01Waterproofing Systems
Terraces, basements, podiums, wet areas and infrastructure
01 ยท Diagnosis & selection
Identify exposure, water pressure, movement and access before selecting a compatible system.
02 ยท Application approach
Check substrate moisture and strength; repair defects; detail penetrations and joints; apply the specified primer and system; protect during curing.
03 ยท QA / QC
Record surface condition, consumption, film thickness where applicable, adhesion and flood testing where suitable.
TECHNICAL GUIDE 02Concrete Repair
Spalling, honeycombing, cracks and structural rehabilitation
01 ยท Diagnosis & selection
Distinguish cosmetic defects from structural deterioration; investigate corrosion, movement and root causes.
02 ยท Application approach
Remove unsound concrete; clean and treat reinforcement as specified; apply bonding system where required; reinstate with compatible repair mortar.
03 ยท QA / QC
Check substrate preparation, repair depth, curing and required bond/strength tests.
TECHNICAL GUIDE 03Construction Joints & Sealants
Movement joints, construction joints and penetrations
01 ยท Diagnosis & selection
Determine joint movement, exposure, geometry and compatibility with adjoining membranes.
02 ยท Application approach
Prepare sound clean joint faces; install backing rod or waterstop where designed; prime if specified; apply sealant to required geometry.
03 ยท QA / QC
Inspect continuity, adhesion, joint dimensions and watertightness.
TECHNICAL GUIDE 04Admixtures & Concrete
Workability, durability, setting and permeability
01 ยท Diagnosis & selection
Review mix design, cement compatibility, aggregate grading, site temperature and performance requirements.
02 ยท Application approach
Carry out laboratory and site trials; follow approved dosing and mixing sequence; monitor fresh concrete properties.
03 ยท QA / QC
Test slump/flow, setting, strength and relevant durability parameters.
TECHNICAL GUIDE 05Industrial Flooring
Epoxy, polyurethane and cementitious flooring
01 ยท Diagnosis & selection
Assess traffic, chemical exposure, substrate moisture, cracks and slip resistance.
02 ยท Application approach
Prepare concrete mechanically; repair defects; check moisture; apply approved primer, screed and topcoat system.
03 ยท QA / QC
Measure coverage, thickness, adhesion, finish and curing conditions.
TECHNICAL GUIDE 06Grouts & Anchoring
Machine foundations, baseplates and chemical anchors
01 ยท Diagnosis & selection
Confirm loads, hole geometry, edge distances, vibration and exposure.
02 ยท Application approach
Prepare clean holes and surfaces; install grout or anchor strictly to approved manufacturer procedure.
03 ยท QA / QC
Verify installation records, curing, torque or proof testing where specified.
TECHNICAL GUIDE 07Technical Specifications
BOQ, method statements and material selection
01 ยท Diagnosis & selection
Define performance, exposure, substrate, service life, compatibility and applicable project standards.
02 ยท Application approach
Prepare a system-specific specification and method statement with materials, sequence, mock-up and hold points.
03 ยท QA / QC
Document acceptance criteria, testing, warranties and maintenance requirements.
TECHNICAL GUIDE 08Quality Control & Testing
Inspection checklists, site trials and handover
01 ยท Diagnosis & selection
Set inspection and test plans before application and define who signs off each hold point.
02 ยท Application approach
Record batch numbers, ambient conditions, surface preparation, application rate and cure time.
03 ยท QA / QC
Perform relevant inspections and tests and maintain traceable handover records.