Aggregate separates or excessive bleed water rises.
Use the site evidence to agree a project-specific method with the responsible engineer, concrete producer, manufacturer or specialist applicator.
Aggregate separates or excessive bleed water rises.
Check grading, fines, water content, dosage and mixing sequence.
An unstable mix or excessive dispersant can lose cohesion.
Rebalance aggregate and paste with the concrete technologist; verify admixture compatibility in trials.
Maintain measured batching and controlled mixing; reject visibly unstable loads under the plan.
Assess stability, slump flow where relevant, bleeding and hardened properties.
Do not compensate segregation by adding cement or admixture without a documented trial.
References inform the topic; they do not endorse a specific product for this project.