Finishing and formwork removal are delayed.
Use the site evidence to agree a project-specific method with the responsible engineer, concrete producer, manufacturer or specialist applicator.
Finishing and formwork removal are delayed.
Compare temperature, cement, retarder dosage, batch records and contamination risk.
High dosage or low temperature may delay hydration and setting.
Review mix with producer and supplier; perform controlled setting and strength trials.
Control dosage accuracy and prevent cross-contamination of admixture lines.
Confirm set and early strength before formwork removal or loading.
Do not strip formwork by clock time alone when setting is abnormal.
References inform the topic; they do not endorse a specific product for this project.